REGIONAL BUILDING DEPARTMENT
830 Due north Main St • Pueblo, CO 81003
Phonation: 719-543-0002 • FAX: 719-543-0062

Ofttimes Asked Questions

When do I need a Permit?

More often than not, whenever yous are edifice or modifying the structure of an existing edifice: This list is not all inclusive if you are unsure if your project requires a let please accomplish out to us for assistance.

    Building:
  • Garages, Carports - require a permit

  • Sheds, Storage Buildings - For Residential projects larger than 200 square anxiety crave a permit. Commerical projects larger than 120 sqft require permits. Note that approval from City or County Zoning may be required regardless of the size. Check with the advisable zoning department

  • Fences - Fences 7' and lower in height do not require a edifice permit. In that location are zoning rules regarding fences, especially when they extend by the front end of your edifice. Please check with the appropriate department. Fences over seven' in height require a permit and engineering.

  • Covering, Re-Roofing - A edifice let is required

  • Decks - A permit is required for any deck that is attached to a building or is 30" or more off the basis

  • Interior Remodels - Permits are required for work remodeling a structure such equally calculation a bathroom, finishing a basement, irresolute the floorplan, etc.

  • Electric:
  • Reconnect - In some cases the utility may require a reconnect inspection before releasing service to an address. This is not a permit for work and only covers the condom inspection.
    If the safety inspection fails additional permits may be required by licensed contractors to prepare all safety bug before service will be released to the utilities.

  • Service - Upgrading or repairing the service will require a permit.

  • Solar - Replacing or repairing a water or sewer line requires a permit.

  • Mechanical:
  • Gas piping - Repairs or replacement of gas pipes may require permits. A pressure test may be required earlier service can be turned on by utilities.

  • Vent/Duct work - Installing/replacing vents or ductwork for new systems such equally bath fan or hvac systems require permits.

  • Furnaces/AC - A Mechanical and/or Electrical permit is required to install/replace furnace, including air workout. Fume & CO detectors are required.

  • Plumbing:
  • Water Heaters - A Plumbing and/or Electrical allow is required to install/supercede a water heater. Smoke & CO detectors are required.

  • Water/Sewer line - Replacing or repairing a water or sewer line requires a let.

  • Plumbing repairs/Replumbing - Replacing or repairing the plumbing in a structure may require a let delight reach out to us for more data.

Electric FAQ'S

  1. Who needs an electrical license?
  2. A. Anyone who performs new construction and rewiring of existing structures; installs electrical wiring equipment devices, calorie-free fixtures, services and meter bases.

  3. How practice I get a contractor back to stop a project?
  4. A. Kickoff, y'all need to get a detailed list of work to be performed and how payments are to exist fabricated. Recollect, never make a final payment until an electric inspector performs an inspection and you have a copy of the certificate of compliance.

  5. Where tin I get the latest edition of the National Electric Code?
  6. A. Y'all can purchase them from our office at 830 North Chief St. or nearly electric supply businesses, bookstores or the National Fire Prevention Clan past calling 1-800-344-3555 or the International Clan of Electrical Inspectors at 1-800-786-4234.

  7. How do I know if a contractor has a required license?
  8. A. Enquire to see the electric current license. If in doubt, telephone call 543-0002 to verify that the license is current.

  9. How high should the meter be?
  10. A. The current City/Canton ordinance requires the meter exist between 4' and 5 ane/2' to the bottom of the meter can.

  11. Tin I run a water line and an electrical line in the same trench?
  12. A. Yes. As long as the minimum depth requirements is maintained for each line. We suggest that a separation be kept between the lines to let for repair of one without affecting the other.

  13. What time is my inspection?
  14. A. The best manner is to talk to the inspector between 8:30am and 9:00am, the inspector tin give a text bulletin approximately 30 min before inflow. The inspectors will normally leave for the field between 9:00am and 9:30am.

  15. Who can answer code/ installation questions?
  16. A. Electrical inspectors are available in the office or past phone (543-0002) from 7:thirty a.1000. to 9:00 a.thou. Monday-Friday.

  17. Electrical - Can I use my electrical service for the house for temporary construction power?
  18. A. Yes. The permanent service may exist installed prior to the electrical systems. Some of the service equipment is intended for indoor use only. If a wall and roof are non in place, an adequate method of protecting this equipment from the weather (water, air current, snowfall, etc.) shall exist provided. Please NOTE: No electrical installations (wiring and boxes) can exist fabricated until there is a waterproof roof and adequate protection at the exterior walls.

  19. Where are Arc Mistake required residentially?
  20. A. 210.12 Arc- Error Circuit-Interrupter Protection. Definition: Arc- Error Circuit-Interrupter Protection (AFCI). A device intended to provide protection from the furnishings of arc faults by recognizing characteristics unique to arcing and by functioning to de-energize the circuit when an arc fault is detected. National Electrical lawmaking NFPA 70 210.12 requires the following areas to have arc fault protection: all 15 and 20 ampere branch circuits supplying outlets installed in abode units. In family rooms, dining rooms, living rooms, parlors, libraries, dens, bedrooms, sunrooms, recreation rooms, closets, hallways, or like rooms or areas.

Mechanical FAQ'south

  1. Can the temperature and pressure level relief device on a water heater be piped into the water heater pan?

    No. The temperature and pressure relief device must be piped to an approved plumbing fixture or to the outside.

  2. Is a permit required for a replacement of a h2o heater or furnace?

    Yes, a permit and inspection are required for the replacement of whatever gas equipment or the installation of whatsoever new gas equipment.

  3. How close tin can a gas meter regulator be to a source of ignition or electrical equipment?

    Equipment must maintain a minimum of 3 (3) feet from the opening of the regulator for natural gas or five(5) feet for propane.

  4. What are the requirements for testing of gas piping?

    The gas piping must exist pressure tested with a minimum of ten lbs. of pressure and the test must hold pressure for 15 minutes. For welded piping, the test presssure is 60 lbs for 24 hours.

  5. Are carbon monoxide detectors required?

    Yes, Carbon monoxide detectors are required if any work is done inside the home! The detector is an cheap buy that could save you or your family's life!

  6. Can I install a water heater in my flat?

    No. Whatever apartment or rental unit or commercial building must have a licensed contractor install gas or electric equipment.

  7. A serviceman told me that my furnace has to be replaced due to a cracked oestrus exchanger. How can I be sure that the oestrus exchanger is bad?

    First, the contractor must exist working for a licensed contractor within Pueblo Canton. If a home owner wants the Building Section to verify, a fourth dimension volition be ready with the contractor, the home possessor, and a mechanical inspector.

  8. Is a let required for air conditioning that will be installed on my existing furnace?

    Yeah. A allow is required for the air conditioning and electrical work that will be done. After the work is completed, the contractor must schedule an inspection of the work.

  9. I am going to enclose my furnace and water heater in my basement. What practise I need to be aware of?

    Here once again, a permit is required. Items to exist aware of are: Access to the units, clearances to equipment, combustion air requirements, make-up air, and clearances of venting systems, etc.

  10. I have questions apropos how to install a gas line for a clothes dryer or other appliance. How do I brand contact with a mechanical inspector?

    The field inspectors are in the office between 7:30-8:30am, Monday thru Friday and all yous need to do is call and enquire to speak to a mechanical inspector for your part of boondocks.

If you have additional Mechanical (Gas, HVAC) Questions, please contact Terry Nothaft or phone him at 543-0002

Plumbing FAQ's

  1. Does a lawn sprinkler arrangement require a permit and inspection?

    Yes, we audit to assure that proper material is used, proper backflow protection is installed, and that the installation is done to lawmaking.

  2. Do sewer and h2o penetrations through concrete walls require sleeves?

    Yes, lawmaking requires that "all piping passing under or through walls shall be protected from breakage". Also "sleeves shall be provided to protect all pipe through concrete or masonry exterior or bearing walls.

  3. Must sewer and water penetrations through concrete walls be sealed?

    Yes, annular space between sleeves and pipes shall exist filled or tightly caulked with coal tar, asphaltum compount, or other material found equally effective and approved as such by the administrative authority.

  4. Why is thermal expansion required with the installation of backflow assemblies?

    Installation of a backflow assembly on a main h2o service creates a airtight arrangement, not allowing expansion from heated h2o to misemploy into the principal. A thermal expansion device eliminates this problem.

  5. Why are pressure level-balance valves required in showers or tub/shower units?

    This lawmaking requirement was added because of the numerous cases of scalding due to cold water usage elsewhere in the structure, which caused sudden bursts of hot water to flow from the fixture.

  6. Why does a water service have to be 48" deep?

    With the varying depth of the frost line Pueblo Canton a uniform depth was required. 48" meets the code requirement of "1ft. below frost line" in the majority of areas in the county.

  7. How can stores sell a product if it isn't legal to install?

    In order to protect the health of the public, the Plumbing Code requires that all products be tested to assure that they not only meet stringent manufacturing requirements just that they as well meet the requirements of the code. If the product doesn't encounter both information technology cannot be installed.

  8. Can I employ PVC for water pipage inside my house?

    No, PVC pipage is not approved for utilize inside a structure. This is a manufacturers standard.

  9. Can I practice the plumbing in my rental?

    No, per Ordinance Sec. 4-ane-9 "...shall exist occupied by the owner every bit the owner's primary place of residence. This is done for the protection of the tenants of the construction.

  10. What is the required examination for DWV systems?

    At that place are two procedures that are approved. You may use either a five# air pressure test or y'all may make full the system with water to a 10' height or to the highest betoken through the roof. (The five# air test must be gear up at 5#, not higher in hopes that it will exist at 5# when the inspector arrives.)

If you have additional Plumbing Questions, delight contact Dan Jones or phone him at 543-0002

Office Hours: Monday-Friday 7:30 AM to four:30 PM
Closed: New Years Eve, Memorial Mean solar day May 31st, In Observance of July quaternary closed Mon July 5th, Labor Day Sept. 6th, Thanksgiving + Fri, Christmas Eve

Source: https://www.prbd.com/faq.php

Posted by: smiththoself.blogspot.com

0 Response to "Does Nc Require A Permit In A House For Plumbing Repair"

Post a Comment

Iklan Atas Artikel

Iklan Tengah Artikel 1

Iklan Tengah Artikel 2

Iklan Bawah Artikel